The City of Pico Rivera is proud to announce the launch of the Pre-Approved ADU Plans program. The program offers residents of the City of Pico Rivera an ADU plan designed by the City at no cost. Refer to the Pre-Approved ADU Plan Submittal Process below for a step-by-step guide on the process.

Pre-Approved ADU Plan Submittal Process

As a general guide, the property and ADU must meet all of the following minimum criteria:

  • The lot is zoned to allow for residential use and contains an existing or proposed single-family residence or multi-family structure
  • ADU Minimum Requirements
    • 10’ separation from habitable structures
    • 7’ separation from accessory structures
    • 4′ side and rear yard setbacks
    • Comply with the front-yard setback and lot coverage of the underlying zone
    • Review the ADU Handout for additional information on proposing an ADU.
  • To determine if a Pre-Approved ADU Plan is compatible with your property contact us at:

planning@pico-rivera.org
562-801-4476

Review the Pre-Approved ADU Submittal Checklist for a list of documents that are required at time of plan submittal.

Planning staff will review your application within 2 – 5 business days of submittal. If your application is deemed complete, then staff will provide plan check review fees. If your application is deemed incomplete, then you will be notified of missing information.

Your plans will be routed for Plan Check review once plan check review fees are paid. You will be notified via email once plans are approved or if corrections are required. Corrections require resubmittal of a complete set of plans for a second round of Plan Check. This process will repeat until plans are approved.

Once the plan check process is complete and plans are approved, you will be notified via email with instructions on the next steps for obtaining construction permits. Staff will provide approved plans and an inspection card once all outstanding items have been completed.

Next steps for permit issuance include:

  • Payment of permit fees
  • Outside agency approvals

Available Pre-Approved ADU Plans

Additional Resources

Comments are closed.

Close Search Window